Development of an Algorithm for Crane Trajectory Distance Calculation for Erection of Precast Concrete Members
License Plate Bracket Reducing the construction time for large logistics buildings can result in reduced construction management costs and economic gains from early operation.A large logistics building with a heavy load and long spans was constructed as a precast concrete (PC) structure, which required the use of a sizable crane to lift heavy PC me